Despite temperatures nearing the 100 degree mark outside and even higher under the uninsulated roof, the plumbers managed to dig up the concrete slab, dig the trenches in the soil and lay the plumbing pipes of our new school. We have a design in which there will be two sinks and a toilet in every classroom, so there were a lot of pipes to lay! After laying the new plumbing pipes down, the construction workers poured gravel over the pipes and re-poured the concrete slab. We will soon be ready to put up the interior walls and the insulation. Its moving quickly!